Fukang Pumped Storage Power Station in Xinjiang

Fukang Pumped Storage Power Station in Xinjiang

YREC is responsible for construction supervision and consulting services of the Project. The upper reservoir has an active storage capacity of 6.62 million m3, and the reinforced concrete face rockfill dam has a maximum height of 133 m. For the lower reservoir, the concrete face rockfill dam has a maximum height of 69 m. The power station is equipped with 4 sets of 300 MW reversible turbine generating units with total installed capacity of 1,200 MW. Under the power generation condition, the rated flow of a single unit is 71.6 m³/s, and the rated head is 484 m. Under the pumping condition with minimum lift of 466 m, the rated flow of a single unit is 61.5 m³/s. The construction of the Project was started in April 2016, and will be completed in January 2026.