The double curvature concrete arch dam has a height of 230 m. Lots of exploration, geophysical exploration and tests such as drilling, adits, optical imaging, deformation tests and large-scale shear tests have been completed to solve engineering geological problems including karst leakage of reservoir, sliding stability of dam abutments and stability of high slopes.